Joseph Chaudhari (A Team)
Week 3 Blog
“What are the possible future
problems with Revit/BIM?”
Future problems
are potentially many when it comes to software such as Revit or other BIM. As we
discussed in week three’s lecture, one major issue that Revit could be posed
with as it evolves regards its ability to process large files. As we could only
imagine, construction projects will only get bigger, more complex, and more (clean)
energy oriented as time progresses. Larger projects will result in more
paperwork and project drawings, be they HVAC, geotechnical, or structural (or
any of the many more types of drawings), which will require a more advanced
version of Revit and a computer with more processing power to entertain the
idea of even running a version of Revit that could sustain files of such size. What
if Revit cannot handle these big files? What if computer processing power cannot
support the advanced versions of Revit that will be needed to enable usage and
creation of these large files? If either of these questions have an answer that
is negative in manner, then we will be in a great deal of trouble as we will
have computers “freezing” or Revit taking quite some time to open and import
files. Slow programs, be they Revit or any other BIM, will result in low
employee morale and thus a poor workplace environment. I have seen and
experienced employees acting in such a way due to technological hindrance and
it is not pretty.
The speaker
we had this week, week 3, in class mentioned how big of a hassle it is for
Revit to update. Dr. Mitchell then elaborated on this saying how it may be very
likely that older Revit files, say for a project that took place in 2015, might
not be openable on a version of Revit in 2036. This will come into play if a building
ever needs maintenance or any services that will require old, original, drawings
to be viewed. What will engineers do if they cannot view the original plans
that were made for the building. This type of problem can be seen in programs
like Microsoft word (where an older file cannot be opened).
Another
problem with future Revit lies in the philosophy of “giving a man a fish will
feed him for a day, but teaching him how to fish will feed him forever”. What I
mean by this is if Revit becomes too user friendly or too simply such that,
maybe with the aid of artificial intelligence, an engineer is no longer needed
and any user could just punch a few keys or run a few commands and create a
completed building ready for construction, we could see ourselves in a world of
turmoil. Why would this be bad? Would it not be a good thing if engineers were
no longer needed heavily in the design process and a computer with AI could
just “do the whole thing”? No, this would be bad in the long run because we
could run into situations where computers designing the building are destroyed
or the theory I talked about earlier comes true and Revit crashes on a project.
Engineers or whoever would be controlling these computers would not know how to
read project drawings or determine what goes where on a construction site if
the design process became this easy due to an extremely advanced version of
Revit or BIM. It would, in a sense, possibly make engineers “weaker” assets to
companies as they might not care to know the extra details regarding a building’s
drawings if Revit could just take care of everything.
Job loss. Job
loss is always an issue as industries and their technologies evolve. Better BIM
systems would mean less time being spent on design contracts for projects. Less
time spent on individual projects mean more, theoretically, could be accomplished
with less. The less I am referring to would be employees. Advancement of BIM
could lead to one brand of BIM dominating the other entirely; thus, entire companies
could fail, go bankrupt, or be bought by the larger and dominating company [1].
This could result in potential job loss.
Ultimately, I
think the benefits future versions or Revit and BIM will bring to the table (as
along as Moore’s Law hold relatively true) will greatly outweigh their
shortcomings.
References
1. The Urban Developer. "10
Predictions for the Future of Building Information Modelling (BIM)."TheUrbanDeveloper.com.
N.p., 07 July 2016. Web. 26 Jan. 2017.
Responses
Peter Dannemann: Using drones to collect data for
geotechnical or surveying data and then importing that data to Revit would be
amazing. I have spent a lot of my time in the field surveying and it can get
tiresome and it can sometimes be impossible if there is a physical barrier
between the surveyor and the Trimble Total Station. I have also spent a lot of
time flying drones over the past three years and I think it would be so much
easier using a drone (maybe with infrared sensors on it?) to pick up information,
help in the surveying process, and convey that information directly to Revit.
Maria Raggousis: Revit and other types of BIM technology
behaving slowly or freezing is terrible. It can cause employee frustration and
lower the effectiveness of an entire office. Even worse, slow or malfunctioning
equipment can cause loss of projects, missed deadlines, and loss of money. Thank
you for providing the story in your post about how your firm fixed the issues
of crashing computer programs. Having multiple version of the same software is
a good back-up plan for the worst-case scenarios.
Drew Hovey: I completely agree with you and am
glad you up the fact that Revit will indeed be extremely helpful in the future,
as it is now, as it evolves. Revit will have its problems, such as freezing or
lacking to carry over files from one version of the program to another, but
ultimately these small hindrances will be negligible compared to the advantages
brought about future versions of Revit (at least I hope so).
Joseph, I thought your comment on BIM becoming too advanced was particularly interesting. I agree that it's not a huge leap to say that BIM might become too user friendly, given the rate of software and AI development in other industries. A danger that could emerge is that the programs become so comprehensive that little room for engineering judgement is left, and fewer checks and balances exist to make sure what the program is doing is accurate and safe. Hopefully the developers of BIM keep this potential problem in mind as they expand of BIM's capabilities.
ReplyDeleteJoe I love how you mentioned the quote “giving a man a fish will feed him for a day, but teaching him how to fish will feed him forever”. I agree with you 100% slowly as the programs become more and more advanced or “user friendly” the engineer will become lazier and take it all for granted as the software will be doing most of the work.
ReplyDelete