Comparing to CADD, BIM concentrates more on conceptual design
and gradually changes the design process and methodology. The chapter discusses
the influences of BIM from three perspectives: integrated services, conceptual design, and construction-level modeling.
Traditional design services tend to be a time-related
single-line workflow process such as design-bid-build or design-build, and a new
form called Integrated Project Delivery (IPD) was introduced with the
application of BIM. Unlike the traditional delivery, IPD provides a more
dynamic collaboration and communication form, thus the design will be more
efficient.
(tbc)
Starting from the information development, which is the
first step of the design a building, it can be divided into low end and high
end spectrums. BIM offers a shortcut for the design of the low-end buildings
with fixed characters and functions. The design of the high-end buildings with
new functions often requires a large amount of information exchange within the
design team and between the team and the clients, during which BIM can be a
handy tool.
When it comes to the design part, BIM benefits our
architects and engineers with conceptual design, building system simulation and
analysis, and construction-level modeling. Traditional conceptual design is mainly
sketched freehanded, and that is the basic media of documentation and
communication. Nowadays, although many designers still adhere to freehand
sketch, more have accepted the use of quick 3D sketching tools such as
SketchUp. These tools make it more convenient for people to modify,
understand, and track the drawings. The build-in elements in the software also
allow designers to generate the sketches more quickly.
(tbc)